Buying Off-Plan in Spain: Guarantees, Payments and Warranties
Buying a villa before it is finished is one of the best ways to get a contemporary home on a prime plot, often with the chance to choose finishes and at a price set before completion. It also means paying money for something that does not exist yet. Spanish law takes that risk seriously. Here is what protects you when buying off-plan in Spain, and what to check before signing.
How off-plan payments usually work
Every developer sets its own schedule, but a typical structure looks like this:
- A reservation deposit to take the unit off the market.
- A private purchase contract, with a larger payment on signing.
- Stage payments during construction. Together with the earlier payments, these often add up to around 30–40% of the price.
- The balance on completion, when the public deed is signed at the notary and the keys are handed over.
The amounts paid before completion are known as cantidades entregadas a cuenta, and they are what the law protects.
The legal guarantee on your payments
Under the first additional provision of the Building Act (Ley 38/1999 de Ordenación de la Edificación, as reformed by Ley 20/2015), developers of residential property must guarantee every amount buyers pay on account. The guarantee must take the form of a bank guarantee (aval) or an insurance policy from an authorised insurer. It covers the payments plus legal interest.
- It applies from the moment the building licence is granted.
- Payments must go into a special account, separate from the developer’s other funds.
- If the project is not started or not delivered on time, you can claim back what you paid, plus interest.
- The guarantee stays in force until the home is delivered with its first occupation licence.
- The cost of the guarantee is borne by the developer, not by you.
Ask for an individual certificate of guarantee for each payment you make, in your name. A promise that the guarantee exists is not enough.
Warranties once the villa is built
The same Building Act sets out how long the parties involved in construction are liable for defects, counted from handover:
| Period | What it covers |
|---|---|
| 1 year | Finishing defects |
| 3 years | Defects affecting habitability, such as damp, insulation or installations |
| 10 years | Structural defects. For housing, decennial insurance (seguro decenal) is compulsory |
Claims based on these warranties must be brought within two years of the defect appearing, so report problems in writing as soon as you see them.
What to check before signing
- Building licence: make sure it has been granted, and that the payment guarantee is linked to it.
- Specifications and plans: the contract should attach detailed plans, a specification of materials and the energy targets.
- Delivery date and penalties: what happens if the work is delayed.
- Changes and extras: how changes to finishes are priced and approved.
- Taxes: new builds pay VAT (10% for homes) plus stamp duty, not the resale transfer tax. Our step-by-step buying guide covers the full process.
Why buy off-plan in Sotogrande
The best plots in Sotogrande are limited, and many of the most interesting new homes are sold before completion. Buying early gives you more choice of plot and orientation. You can adapt layouts and finishes to how you live. You also get a home built to current energy standards, which matters more each year for both running costs and resale value. See why in Zero energy and luxury: the new standard in Sotogrande.
This article is general information, not legal advice. Always have your own lawyer review the contract and the guarantees.
Our villas
Cork Oak Mansion develops contemporary villas in Sotogrande designed by Fran Silvestre Arquitectos. Several of our projects in Sotogrande are coming soon, and we can share plans, specifications and the payment structure with serious buyers. Explore our villas for sale or contact us for the full brochure.